What Gets Overlooked When Reviewing MEP Drawings Most drawing review reports are mainly concerned with the visible elements of the project such as which equipment goes where, routes of ducts and pipes, layout of electrical cables etc. Even though these aspects are important, they do not provide insight on the overall readiness of the design. Although a set of drawings might appear to be complete, contractors might still have unanswered questions: How will the equipment be maintained? Is there enough space for duct installation? Will the electrical room meet the equipment clearance needs? Did the designer take existing site conditions into consideration? Such questions do not usually get considered during the first drafts’ review. Still, they often result in RFIs, alterations in the field and design modifications right before the start of the construction. For designers, contractors and developers, the review of MEP drawings should not only involve checking that the drawings are accurate but also help to determine if the systems will work in the project, if it fits into the construction timetable and if it meets the owner’s operational needs.
- Equipment Locations Without Considering Access One of the most commonly missed aspects is the amount of space required for equipment installations. While a rooftop system may fit just fine, and the mechanical room layout may show a pump fitting perfectly, actually accommodating the equipment in the required space is only half the equation. Eventually, someone will have to perform inspections, change parts, replace filters, etc. For example, when looking at an air handler above a hallway ceiling, while it may be clearly marked on drawings, one must consider the amount of space required for filter changes and internal access.