Open Uncomplicated

A presentation at online webinar in June 2020 in by erik riedel

Slide 1

Slide 1

OPEN UNCOMPLICATED SIMULTANEOUS SCALING FOR USER AND APPLICATION GROWTH Erik Riedel, PhD Senior VP, Engineering | ITRenew @RiedelAtWork

Slide 2

Slide 2

Hyperscale for All: Powering the Circular Data Center ITRenew delivers maximum financial & sustainability returns from open technology CIRCULAR CLOUD DECOMMISSIONING SESAME BY ITRENEW EDGE SOLUTIONS Strategic Advisory Services and Data Security Rack-Scale Solutions and Components Infrastructure planning Data center decommissioning services Rack-scale solutions for data centers Edge solutions & building blocks TCO & Sustainability Modeling Teraware data sanitization platform Open systems, HCI, AI/ML Server components Breakthrough TCO Laptop and PC memory Lifetime value maximization Value Recovery ($1B+ TCO to date) End-to-end logistics solutions

Slide 3

Slide 3

Slide 4

Slide 4

We have the proof that Open for All is not just a utopian vision, it is real and ready today: preconfigured, plug-in-ready rack-scale solutions, built on open architecture. No assembly. No guesswork. Soz No army of engineers required. Now anyone can power their data center like a hyperscaler while dropping their TCO and upping their sustainability game.

Slide 5

Slide 5

Slide 6

Slide 6

Slide 7

Slide 7

Slide 8

Slide 8

Slide 9

Slide 9

Slide 10

Slide 10

Slide 11

Slide 11

Slide 12

Slide 12

Slide 13

Slide 13

open hardware open software

Slide 14

Slide 14

Massive budgets and talent pools The big cloud providers have all the advantages Most advanced technology Greatest flexibility to scale Lowest costs

Slide 15

Slide 15

If everyone had the advantages, they could… Deliver more new services Respond faster to customer needs Grow the user base Increase margins & accelerate growth

Slide 16

Slide 16

Open Is Necessary, But Not Sufficient Per Se design, engineering and product expertise, rigorous commitment to component quality [hardware] design, engineering and product expertise, rigorous commitment to component quality from capacitors to consensus algorithms to cognitive load wide dynamic range of skills must be applied & appreciated ORCHESTRATING AN OPEN HARDWARE + OPEN SOFTWARE STACK [software] requires baseline partnership across hardware & software devops – collaboration from designers & developers to operations automation, analytics, and machine learning for all the things can’t be efficient at hyperscale without the machines making many, most decisions

Slide 17

Slide 17

The Benefits of Open Hardware MORE FLEXIBILITY HIGH DENSITY COMPUTING OPTIMIZED POWER OPTIMIZED COOLING STREAMLINED MAINTENANCE Multi-vendor, standards-based hardware for modular solutions to fit your needs More server, storage, and network capacity, in less space saves costs Rack-level power vs. individual server power. More efficient. Less cost. Fewer points of failure Rack-level cooling to operate more efficiently. Even more with free-air cooling, if the data centers support it Flexible, easy-access design enables faster troubleshooting, updates, and upgrades

Slide 18

Slide 18

The Benefits of Open Software MORE FLEXIBILITY HIGH DENSITY COMPUTING OPTIMIZED POWER OPTIMIZED VALIDATION STREAMLINED MAINTENANCE Multi-vendor, standards-based software for modular solutions to fit your needs More automation, with API-driven scalability, allows more software per silicon in2 Stack-level power vs. individual packaged software. More efficient. Less cost. Fewer points of failure Stack-level continuous integration, continuous deployment (CI/CD) to validate more efficiently. Fewer points of failure in the field Flexible, API-based, devops-considered design enables faster troubleshooting, updates, and upgrades

Slide 19

Slide 19

Slide 20

Slide 20

Slide 21

Slide 21

THE POWER OF HYPERSCALE FOR ALL Optimized for your workload, from deskside to data center. No assembly. No guesswork. Just plug them in. PROVEN HYPERSCALE TECH BUILT ON OPEN ARCHITECUTURE CONSISTENT PRODUCT DEPENDABLE SUPPLY BUSINESSCHANGING TCO

Slide 22

Slide 22

Optimized For Workloads. Ready To Deploy NO GUESSWORK. NO ASSEMBLY. JUST PLUG THEM IN. SESAME FOR OPEN SYSTEMS SESAME FOR AI/ML SESAME FOR CONVERGED Massive scale, cross-rack switching interconnects up to 20 racks; 750+ nodes in a single cluster, network domain High bandwidth, low latency platform to optimize learning Simplicity of design with standardized converged nodes Powerful application processing on large and small accelerated compute nodes Compute, storage and network capability scalable in lockstep as needed 100G and bandwidthoptimized connectivity for top throughput Fully open configuration and manageability tools, qualified and optimized for Linux Pre-validated with Kubernetes software and infrastructure stacks Linux-ready with scalable hardware management

Slide 23

Slide 23

Slide 24

Slide 24

Sesame for Open Systems • Massive scale; cross-rack switching interconnects up to 20 racks; 900+ nodes in a single cluster, network domain • Pre-validated with Kubernetes software and infrastructure stacks • Linux-ready with scalable node-level management CAPACITY • 6 to 36 nodes per rack – mix of node types • • • PERFORMANCE • BASE config: 150+ cpu cores & >1 TB memory single-socket x86 compute • SCALE config: 700+ cpu cores & >8 TB memory 2-socket x86 compute • 5 TB to 250 TB of high IOPS flash storage/ rack storage nodes w/ NVMe flash • 2.5 kW to 18.9 kW per rack • 3, 6, or 9 infrastructure nodes/rack • Full 25 GbE connectivity within the rack WORKLOAD FLEXIBILITY • Pre-designed/integrated racks fit most common Kubernetes/VM orchestration deployment architectures • Servers, storage, and networking hardware is pre-qualified and pre-tested • Designed to fit the space & power constraints of most modern data centers external TOR switches (2x) ingress ingress ingress internal TOR switches (2x) compute compute compute compute compute compute compute compute compute compute compute compute compute compute compute compute compute compute power zone BB compute compute compute compute compute compute compute compute compute storage storage storage storage storage storage storage storage storage mgmt mgmt mgmt infra infra infra power zone AA

Slide 25

Slide 25

S e r ve rs external TOR switches (2x) ingress ingress ingress internal TOR switches (2x) compute compute compute compute compute compute compute compute compute compute compute compute compute compute compute compute compute compute power zone BB compute compute compute compute compute compute compute compute compute compute compute storage storage storage compute storage storage storage compute storage storage storage infra mgmt mgmt mgmt power supply + switch infra infra infra up to 5 nodes Fast-Start power zone AA up to 45 nodes for Open Systems single or 2- socket nodes, 25 GbE connectivity flash-based storage nodes; millions of IOPS and terabytes of capacity

Slide 26

Slide 26

C a s e S t u d y – P ro j e c t G o a l s a n d G e n e s i s Many service provider & enterprise SaaS companies OCP adoption could be accelerated by offering pre-designed and pre-qualified solutions for key computing use cases. are looking for solutions to roll onto the floor, plug in, and quickly run workloads. We are working with infrastructure software stacks and software partners to pre-design and pre-qualify solutions with OCP equipment.

Slide 27

Slide 27

Slide 28

Slide 28

C a s e S t u d y – F ro m S e r ve rs to S e r ve r l e s s i n 1 0 2 3 M i n u te s Provisioning Server Linux DevOps Automation Our Choices Ubuntu 19.04 docker, Ansible Rancher Deployed Services DRP (PXE server) DHCP (static IPs) Digital Rebar docker registry Rancher

Slide 29

Slide 29

S e r ve rs SCALE compute compute compute compute infra power supply + switch DRP (PXE server) DHCP (static IPs) compute CRIMSON 2x 12c 256GB 10G compute CRIMSON 2x 12c 256GB 10G compute CRIMSON 2x 12c 256GB 10G compute CRIMSON 2x 12c 256GB 10G 96 cores 1 TB memory

Slide 30

Slide 30

1 st S te p – S u c c e s s ! O S e s D e p l o ye d

Slide 31

Slide 31

2 nd S te p – D e p l o y R a n c h e r

Slide 32

Slide 32

4 th S te p – S u c c e s s ! Workloads Configured

Slide 33

Slide 33

We D i d T h i s W i t h T h re e D i ffe re nt S ta c ks RANCHER KSPHERE TALOS 20 minutes to full cluster readiness 60 minutes to full cluster readiness 31.5 minutes to full cluster readiness 1,650 pods 1,800 pods 3,000 pods 500 pods* 500 pods* 500 pods*

  • d o c k e r e r r o r s s t a r t e d a t 5 0 7 p o d s , c r a s h e d a t 6 0 0 p o d s

c o n t a i n e r s b e g a n t o d i e , k u b e l e t c r a s h e d a t 5 5 0 p o d s ** note that all these tests were done after overriding the default 110 maximum pods per node, as set by Kubernetes

  • h e a l t h c h e c k s b e g a n t o f a i l a t 5 0 0 p o d s STACKS SLEEP CONTAINER NGINX CONTAINER

Slide 34

Slide 34

Serverless

Slide 35

Slide 35

INTRODUCING AN ALL-NEW OPEN RACK SCALE SERVER CHOICE PROVEN HYPERSCALE TECHNOLOGY PURPOSE BUILT READY TO DEPLOY DEPENDABLY AVAILABLE CONSISTENT PRODUCT BY BUSINESSCHANGING TCO MEET YOUR GROWING DATA AND INFRASTRUCTURE DEMANDS WITH THE SAME OPEN HARDWARE AS THE WORLD’S LEADING HYPERSCALERS. 35

Slide 36

Slide 36

C a l l To A c t i o n CHECK US OUT ON OUR WEBSITE: bit.ly/webinar-uncomplicated www.sesame.com Watch Our Videos: Sesame By ITRenew bit.ly/sesame-youtube QUESTIONS OR COMMENTS, REACH US: @RiedelAtWork

Slide 37

Slide 37

QUESTIONS

Slide 38

Slide 38

DATA CENTER IMPACT REPORT: THE FINANCIAL & SUSTAINABILITY CASE FOR CIRCULARITY Download at itrenew.com bit.ly/circular-report

Slide 39

Slide 39

BACKGROUND

Slide 40

Slide 40

Design and procure hardware that enables circularity HYPERSCALE DATA CENTERS 2 … 3 ITRENEW 4 5 INTERNAL RE-USE COST AVOIDANCE 1 LIFETIME VALUE MULTIPLIER RACK-SCALE SOLUTIONS EDGE SOLUTIONS EDGE SECONDARY MARKETS RE-CERTIFIED COMPONENTS CSP Industrial Retail Telco Gaming IoT Energy Enterprise RESPONSIBLE RECYCLING VALUE RECOVERY

Slide 41

Slide 41

The Circular IT Hardware Industry Opportunity WHAT IF… 46 million servers 31 million tonnes CO2e

6.7 million cars’ annual emissions